KCGM | Fim1 Tailings Storage Facility (TSF) Recommissioning
Client | Kalgoorlie Consolidated Gold Mines
Project | Fim1 TSF Recommissioning
Location | Super Pit, Kalgoorlie WA
Project Profile
Scope
Installation of new Tailings Pipeline to Tailings Storage Facility 1
Pipe Work
• Installation of 2,400m of 500mm PN20
• Supply HDPE Fittings
Contract
Lump Sum
Additional Works
• Earthworks including clearing and forming pipeline corridor
• Civil installation of concrete footings and thrust blocks
• Installation of pipe culverts
• Hydrostatic testing of pipeline and commissioning
• Unload and stack pipe with vac lift
Services and Equipment Provided
• Supervisor, Polywelder and Operators
• Supervisors vehicle and welding truck c/w generator
• 30t Excavator c/w Vaclift for handling pipe
• 16t Excavator for pipeline corridors
• Tracstar T500 c/w Polyhorse pipe racking system and power assist
• 2 x Telehandlers and Skid Steer